Set KPI baselines in 10 days

A method for baselining latency, reliability, and cost so you can prioritize by impact.

2 min readStratorys Engineering

Most teams track many metrics and still cannot prioritize architecture work with confidence.

The gap is baseline quality.

Decision question

How do you build a 90-day KPI baseline quickly enough to drive execution decisions now?

10-day baseline method

  1. Day 1-2: scope critical workloads Pick the smallest set of user and business-critical paths.
  2. Day 3-4: capture current-state evidence Collect latency distributions, incident frequency, and cost profile by workload.
  3. Day 5-6: identify constraint drivers Map bottlenecks and failure amplifiers across compute, storage, and ownership.
  4. Day 7-8: define target ranges Set realistic 90-day improvements with risk/effort framing.
  5. Day 9-10: publish prioritized backlog Sequence implementation by expected KPI movement and operational safety.

Baseline rules

  • avoid averages for incident-critical latency paths
  • tie each KPI to one accountable owner
  • include measurement method and refresh cadence
  • define stop conditions for low-impact work

KPI target example

  • p95 critical workflow latency: 320ms -> 220ms
  • monthly priority incidents: 8 -> 4
  • cost per million events: -15% without SLO regression

If your team needs this baseline this month, a direct conversation with Stratorys is the fastest entry path.

Share this post

Continue reading

When not to use Rust

Cases where Rust adds cost without enough payoff, and what to reach for instead.